Educational Facilities

Student Services Center
Anne Arundel Community College

This project involves a new two story 91,200 Sqft. building and a connecting Pedestrian Bridge to the renovation of the existing Student Service Building. The structure is steel framed on conventional spread footings. Construction completion was in 2002.

Completion Date: 8/2002
Total Cost: $7,500,000.00
Work for which firm was/is responsible: $1,200,000.00

Library/Learning Resource Center 
Charles County Community Center

The renovation of an existing two story steel framed building. The scope of work included extensive structural revisions for a new elevator and revised stair access. The project required the removal of the entire exterior of the building and the replacement with a new brick and block exterior. The project required the coordination of the new mechanical systems and the existing structure. New elevator shafts had to be installed. The project was a total of 48,000 square feet.
Completion Date: 7/1997
Total Cost: $4,000,000.00
Work for which firm was/is responsible: $600,000.00

Kiddies Kollege
Laurel, Maryland